Project Description
The purpose of the Verdera North Water Infrastructure project is to provide the City with adequate storage and supply of water to accommodate growth and to enhance reliability to the City’s existing citizens by providing redundancy to the City’s existing system. The project consisted of a 5-MG prestressed-concrete tank, a pad for a future 5-MG tank, 4,000 feet of 36-inch pipeline, 933 feet of 16-inch pipeline to high elevation customers, a sewer pump station and force main, a recreation trail, filling an abandoned 7-acre municipal water storage pond and extensive oak tree mitigation planting.
Coastland | DCCM provided project management services from project inception through construction, including developing project budgets, consultant selection (engineering and construction management), preliminary design studies, design oversight, bidding and award, SCADA, construction, and operational start-up.
The success of this project is attributed to the exceptional collaborative efforts among the team, including the City of Lincoln, Bennett Engineering (Primary Designer) and TRC (Construction Management).
2020 PROJECT OF THE YEAR
This project was awarded the American Public Works Association (APWA) Sacramento Chapter’s “2020 Project of the Year” in the Environment (Water) Category!
“Coastland has consistently provided the City of Piedmont with a high-level of municipal engineering expertise and guidance. They raised the level of professionalism and spearheaded efforts to ensure we provide a consistent, high level of service to our residents. Most importantly, Coastland’s people are of solid integrity, easy to work with, and excellent ambassadors in representing our interests.”
Chester Nakahara, Public Works Director (Retired), City of Piedmont